Utilizing the Step-by-Step MRP Calculation Process, students will solve the following MRP problem given: Product A is an end item and is made from two units of B and four of C. B is made of three units of D and two of E. Product C is made of two units of F and two of E. Product A has a lead-time of one week. Products B, C and E have lead-times of two weeks. Products D and F have a lead-time of three weeks.
 
a. Show the bill of material (product structure tree). 

b. If 100 units of A are required in week 10, develop the MRP planning schedule, specifying when items are to be ordered and received. There are currently no units of inventory on hand.

 
Grading Criteria:

 NEED 1,000 words

  1. Student will demonstrate their relevant knowledge of MRP
  2. Apply critical thinking in applying MRP concepts
  3. Create an Master Production Schedule and a Material Requirement Planning Chart
  4. If there is a positive net requirement in a week, backward schedule by the lead-time and enter the quantity for the planned order release that will satisfy the net requirement.
  5. The student applied correct APA, style, usage, grammar, and punctuation.
 